Concept 1a and 1b
Concept 1a and 1b are continuations of the four-lane divided Willow Street roadway that currently exists near Route 6 Interchange 7. Concepts 1a and 1b continue that four-lane divided roadway from the Higgins Crowell Street/Willow Street intersection in Yarmouth to the Route 28/Yarmouth Road intersection in Barnstable. Concept 1a uses a westerly alignment at the Route 28/Yarmouth Road intersection. Concept 1b uses an easterly alignment at that intersection. |
Concept 2a, 2b and 2c
Concepts 2a, 2b and 2c extend the Willow Street four-lane divided roadway to Rosary Lane in Barnstable. There, Yarmouth Road becomes two lanes, one-way, southbound. Old Yarmouth Road and Rosary Lane become two lanes, one-way, northbound. Concept 2a uses a westerly Route 28/Yarmouth Road alignment; Concept 2b, an easterly alignment. Concept 2c uses undeveloped parcels to the east of the gasoline station/convenience store. A new two-lane roadway is constructed as one-way northbound lanes connecting to Old Yarmouth Road. |
|
Concept 3
Concept 3 extends the Willow Street southbound lanes over the railroad tracks, onto a railroad right-of-way, and down to the Route 28/Engine House Road intersection (a new two-lane roadway, one-way, southbound). The existing two-lane Yarmouth Road is converted to one-way, northbound lanes from Route 28 to the existing four-lane section of Willow Street. |
Concept 4
To better accommodate emergency-vehicle access to the Cape Cod Hospital, CONCEPT 4 uses the existing Yarmouth Road for the southbound lanes. Both existing lanes are converted to one-way from the Willow Street four-lane section to Route 28. A new roadway is built within the railroad right-of-way for the northbound lanes from the Willow Street four-lane section to the Route 28/Engine House Road intersection. This concept requires an overpass/underpass at the northern end of the project. |
|
Concept 5
Concept 5 is the same as Concept 3, but with the rail line in a trench or underground. The new southbound lanes are west of the proposed multi-use path, allowing greater access to it and eliminating conflicts with roadway users at Route 28 and crossing the new Yarmouth Road southbound lanes. |
Concept 6a and 6b
Concept 6a proposes a new four-lane divided roadway from Willow Street to the Route 28/Engine House Road entirely on a right-of-way on the Barnstable Municipal Airport property. Yarmouth Road remains a two-lane, two-direction roadway. CONCEPT 6B proposes a new two-lane (both directions of travel) roadway on airport property. The new roadway intersects Yarmouth Road opposite Rosary Lane and continues south to Route 28 opposite Engine House Road. |
|
Concept 7
Concept 7 proposes a three-lane section from Willow Street to Route 28. The section consists of a southbound lane, a northbound lane, and a center left-turn lane. |
Concept 8 Concept 8 is similar to Concept 1 (a four-lane divided roadway), but with a grade-separated intersection at the Route 28/Yarmouth Road intersection. |